Full Reference Manual
The Intelliprox Blue is a one-door/two-reader Bluetooth® controller designed to grant access to a single point of entry for up to 250 cardholders.
Economical Intelliprox Blue grants access to a single point of entry, and is designed for quick implementation and ease of use.
Intelliprox Blue is capable of controlling two readers on a single door, providing both "in" and "out" reads. This is accomplished through the use of Keri's exit readers in combination with standard NXT readers.
Control Intelliprox Blue through a programming and control app that is available for free in either iOS or Android.
Units are programmed wirelessly through the use of a Bluetooth connection, so the only requirement is the app (loaded on a smartphone), and proximity to the controller via Bluetooth, with a smart device.
Multiple Intelliprox Blue controllers may be programmed and controlled by a single mobile device. Database details may be easily transferred from one Intelliprox Blue to another easily, using the smartphone as a managing medium.
Intelliprox Blue offers everything one would require in the realm of basic access control, including: Door Sense, Door Held, Access Granted, Access Denied, Manual Lock/Unlock, Adjustable Lock/Unlock Times, Auto Unlock and Door Schedules. All this is provided in an easy to install, easy to manage, cost effective package.
Notes:
A fail-safe locking device requires power to keep a door secure. An example of a fail-safe device is a maglock. If power is lost at the lock the door will unlock. To power the lock via the controller's power supply you should ensure that the lock draws a maximum of 1 amp, otherwise the lock should have its own external power supply (separate from the controller's power-supply).
Note: the 1.5KE39C transorb is provided with the Intelliprox Blue ship kit. It should be installed as close as possible to the locking device to prevent transients from the lock affecting controller operation.
A fail-secure locking device requires power to unlock the door. If power is lost at the lock the door will remain locked. To power the lock via the controller's power supply you should ensure that the lock draws a maximum of 1 amp, otherwise the lock should have its own external power supply (separate from the controller's power-supply).
Note: the 1.5KE39C transorb is provided with the Intelliprox Blue ship kit. It should be installed as close as possible to the locking device to prevent transients from the lock affecting controller operation.

Note:The Request-to-Exit input is a 'Normally-Closed' circuit (so the door will unlock when the RTE input circuit goes open).
Size (Enclosure):
2.75” H x 4.25” W x 1.32” D
Controller Board Shell
7.25” H x 6.6” W x 1.8” D
Size (PC Board)
2.36” H x 4.0” W x 0.78” D
Input Voltage:
+ 12 VDC nom. (9-15 VDC)
Current Draw:
Intelliprox Blue Controller – 250 mA
Inputs (2):
Door Contact Switch (Normally-Closed) and Request to Exit (Normally-Open)
Outputs:
1.0 amp (24 VDC max.) dry circuit
Reader Capacity:
2 with NXT Readers * (NXT-xR/NXT-xRE)
Buffer Capacity:
250 Cardholders and 2,500 Event Capacity
Temperature / Humidity:
- 40°F to 140°F (-40°C to 60°C) /- 0-90% Non-Condensing
Communication
Bluetooth v4.2 BLE (Bluetooth Low Energy)
Lithium Battery:
5 years Memory Retention
Note: Specifications are subject to change without notice.
Before initially connecting to the controller you will need to perform a factory reset on it.
Hold down the orange reset button (K2) as you apply the power.
You will notice the green DS1 LED go off then on (twice).
Note: If the app is open when you perform the factory reset, Keri recommends closing then re-opening the app to avoid any connection difficulties.
The Intelliprox Blue uses iOS and Android apps, (available for free) from the Apple App Store and Google Play Store.



Note: On some older Android devices you may experience a few seconds delay with the display of the password prompt.
IMPORTANT NOTES:

The following options are available on the Settings screen:
Note: You will need to be connected to the controller to make any configuration changes.
View or modify the device name and/or password.
Press the OPEN button to temporary unlock the door. The door unlock time is determined by the adjustable door 'Unlock Time'.
The auto-unlock feature allows you to specify a time schedule when the door will automatically unlock and automatically re-lock again. This assumes you have already added additional time schedules to the system (for time schedule setup, go to section 11).
Set the correct time and date on the controller. The controller will be set to the exact time on your smart device.
Configure the controller with the number of readers being used. NXT readers support an exit reader to control the same door - the doors are treated separately for reporting purposes and defining access schedules. If you have an NXT Entry reader and an NXT Exit reader connected to the controller set the door type to Two Reader.
Enables/disables door alarms (if the door is forced/or held-open for longer than the programmed unlock time, then the reader will go into alarm state). While in alarm state, the reader LED will be flashing red and you will hear a constant 'beep-beep'. By default the door alarm is disabled.
This setting determines how long the door will unlock either from a valid card read or via a remote unlock using the app. To adjust the unlock time:
Enabled/disables the anti-passback feature which is supported when using an additional NXT Exit reader. When this feature is enabled, cardholders will not be able to 'pass back' their card to be used at the same reader by somebody else. Valid card presentation must always alternate between the entry and exit readers.
Notes:
- Door contacts must be installed at the door for this feature to function correctly.
- Requires an additional NXT Exit reader.
Anti-Passback Definitions
Credentials can be enrolled either using the controller enrollment button or using the Intelliprox Blue app. One credential is supported per cardholder and the controller will support a maximum of 250 cardholders.
IMPORTANT NOTE: It can take up to a minute to load a large cardholder database. If a cardholder gains access immediately prior to the cardholder list being opened, the door will remain in the unlocked state until the full cardholder list has loaded. Once all cardholders are displayed the door will then re-lock.

Credentials added via the above method will be given total access with no expiration date. Name and other data can be modified at a later time using the app. Access the cardholder section via the Cardholders icon located on the home screen.
Note: When enrolling HID 125KHz credentials, the imprint number will not be displayed (only the internal number). The cards will be displayed in the app in order that they were presented to the reader. For simplicity and ease of use we recommend enrolling HID cards in blocks of no more than 10 at a time. The reason the internal number is used is to allow for the cardholder database to be upgradeable to the Doors.NET software at a later time.
The full cardholder list will load and the total cardholder count will be shown at the bottom of the screen:
Notes: A large cardholder database (more than 100 cardholders) will take a minute or two to load.

The app allows you to search for cardholders using the cardholders full name.
Note: You must enter the cardholder name EXACTLY as it exists in the database:
Note: If you have recently edited the name of a cardholder or enrolled a new cardholder and it is not found when you perform a search, you should re-open the full list of cardholders and then search again. You can refresh the cardholder list by swiping-down on your screen.
Time Schedules contain a list of valid access times for each day of the week. These times are associated with access groups. Access groups are assigned to cardholders to determine when the cardholder can gain access at the door. One advantage of this is that a change to a time schedule will automatically affect all cardholders which are assigned the associated access group.
You can also use a time schedule as an auto-unlock schedule for automatically unlocking and re-locking the door during the day.
The Intelliprox Blue supports two time intervals per day - so if a time schedule is to be active from 09:00 - 17:00 simply set the Start time as 09:00 and the End time as 17:00 for interval 1.
You also have an optional second interval which can be used to automatically unlock and relock the door at a later time in the day. If you do not edit the second schedule it will automatically be disabled and only the settings in interval 1 will be used.
Configure the time range for time interval 1 - for example: 09:00 - 12:00. 

Cardholders are assigned a Time Profile to determine when the cardholders can gain access. The default All User group gives a cardholder access at the door/doors all day, seven days a week). For new time profiles you will first need to create a time schedule - unless you will use the default 'All Time' group.
Note: Multiple controllers can be managed from a single app, but only on a one-to-one basis - (because each controller has its own database). For this reason, a time profile will only contain the reader(s) for a single controller (you cannot setup a time profile that includes readers from multiple controllers).



The following steps explain how download the most current firmware file and then update the controller.


Note: When performing a database backup you will be making a copy of the database stored on the controller. If you have recently enrolled new cardholders using the controller enrollment button you will need to re-open the full cardholder list (this will synchronize the data in the app with the database on the controller). Failure to do this will results in the newly enrolled cards NOT being included in the backup.
The following steps explain how to perform a full backup of the database.

If you are using an iOS device you will have to use iTunes to obtain a copy of the backup file. The following steps explain how to copy the backup file to the PC via iTUNES.



The following steps assume you have the backup file saved on the PC.
Tap the events icon on the home screen to view the most recent event information generated by the system. These events include: Access granted, access denied, door opened/closed/forced/held, etc.
The list of events is not dynamic, so to retrieve the up-to-date list you will need to return to the home screen then re-open the events screen.
The events list is configurable, allowing you to specify the number of events to display when the events screen is opened. Press the 'config' link in the top right corner then enter the number of recent events to display (1-2500).
Tap the Transactions Reports icon to display the list of all recent system transactions. By default, all events will display:
Tap the ALL link and you will be able to specify which event types to list. For example; you may just want to list all the access granted or access denied events.
Tap Reader - Choose which reader events you wish to display. For example; you may just wish to display the events that have been generated by the Entry reader.
Tap Time - Choose whether to list the events in chronological order, or reverse chronological order.
The transaction reports screen also gives you the option to export a report as a .CSV file. Once you have generated a report, press the export link then select a folder where you wish to save the report. The report will contain all the event information displayed on screen. As it is a .CSV file it can be viewed with Microsoft Excel and can be saved to a PC (as with a database backup file). iOS users will require the use of iTunes to copy the backup file to another location (such as a USB drive).
Tap the alerts icon on the home screen to open the alerts screen.
Within this section it is possible to filter critical events in the system, such as the forced door alarm, the door alarm held open, the Anti-passback violation, etc.
Tap the technical support icon on the home screen to open the technical support screen.
The technical support section contains basic setup information for the Intelliprox Blue app and links to Keri Systems corporate website and knowledge base (where you can locate technical and marketing material related to all Keri Systems products). You will also find links to Twitter and YouTube accounts and technical support contact information.
| 0.1 | 22.0 Useful Technical Resources |